Petrobras Awards Lankhorst Ropes Dyneema Deepwater Mooring Line Contract
2011.03.25 -
Contracts

Leading deepwater rope manufacturer, Lankhorst Ropes, has secured the first-ever, worldwide order for Dyneema synthetic mooring rope for deepwater MODU (Mobile Operating Drilling Unit) projects from Brazilian oil and gas producer Petroleo Brasileiro SA (Petrobras).
Gama 98 is a rope construction developed by Lankhorst Ropes specifically for deepwater mooring, and used on a number of major deepwater projects in the Gulf of Mexico. The rope will feature up to 12 Dyneema SK78 yarn sub-ropes. Developed by DSM, Dyneema SK78 is a high modulus polyethylene fibre. This will be the first time the 630t MBL rope has been used for MODU mooring.
In total Lankhorst Ropes will supply 15,000m of Gama 98 rope, manufactured at the Lankhorst Ropes Offshore Division factory in Portugal.
Wilco Stroet, managing director , Lankhorst Ropes welcomed the Petrobras order, “This is excellent news. We are delighted to be working with Petrobras, the world leader in deepwater oil extraction, on this strategically important project as the company develops its global business in oil and gas production.”
Cameron (NYSE: CAM) has signed a three-year worldwide preferred supplier agreement with Schlumberger Integrated Project Management (IPM) for the supply of a wide range of flow equipment products and services. As part of the agreement, Cameron will provide Schlumberger IPM with all surface, subsea, drilling, measurement, compression and downstream equipment on a worldwide basis.
ClampOn has been awarded a contract for delivery of five subsea ClampOn DSP Leak Monitors to the Tampen Link project in the Norwegian sector in the North Sea (Sept 07). ClampOn will supply its ultrasonic non-intrusive acoustic Leak Monitors to Technip Norge AS on behalf of Statoil. The Leak Monitors will be retrofitted on two 20” gas valves on the seabed to verify/disprove through-valve gas leakage. These valves are currently open and they will be shut to close off the bypass alternative.
Helix Energy Solutions (NYSE: HLX) announced today that it has received a Letter of Intent ("LOI") for the installation of the subsea infrastructure for the VIC/P44 Stage 2 Development project in the Otway Basin offshore Australia. Participants in the VIC/P44 permit are Santos Limited (Operator) 50%, Peedamullah Petroleum Pty Ltd (Australian Worldwide Exploration) 25% and Mitsui E&P Australia Pty Ltd. 25%.
Velosi Limited Velosi or the Group, a provider of asset integrity and HSE services to a number of major national and multinational oil and gas companies, is pleased to announce that it has been re-awarded a contract from Mobil Producing Nigeria, for the next three years with an option to extend for a further one year.
Fugro has been awarded a contract to perform a detailed marine survey in the Mediterranean Sea to select the best route for the GALSI gas pipeline from Algeria to Southern Sardinia and then from Northern Sardinia to the mainland of Italy. The contract value is approximately EUR 18 million.