Subsea 7 Announces Contract for E.ON in North Sea
2011.04.04 -
Contracts

Subsea 7, a global leader in seabed-to-surface engineering, construction and services, today announces the award of an engineering and installation contract by E.ON Ruhrgas UK E&P for the Huntington Development in the North Sea. The Subsea 7 workscope comprises the installation of 12km of the 8-inch Gas Export pipeline, installation of infield flexible flowlines, main static umbilical and associated risers as well as installation of subsea structures followed by tie-ins, pre-commissioning and system testing.
Engineering work has commenced in the Aberdeen office with installation using several of Subsea 7’s fleet occurring through to 2012. Steph McNeill, Subsea 7’s Vice President – UK stated: “I’m delighted that E.ON Ruhrgas UK E&P has chosen Subsea 7 to work on its prestigious Huntington development. We have safely and successfully delivered numerous North Sea projects whilst maximising efficiencies through security of supply and early engagement in the planning and design process. We look forward to similar success with the Huntington Development over the coming year.” The Huntington Development is located 140 nautical miles North East of Aberdeen in Block 22/14 in the Central North Sea with water depths of 90m. E.ON Ruhrgas UK E&P is the operator and has a 25 % interest.
Cameron (NYSE: CAM) has signed a three-year worldwide preferred supplier agreement with Schlumberger Integrated Project Management (IPM) for the supply of a wide range of flow equipment products and services. As part of the agreement, Cameron will provide Schlumberger IPM with all surface, subsea, drilling, measurement, compression and downstream equipment on a worldwide basis.
ClampOn has been awarded a contract for delivery of five subsea ClampOn DSP Leak Monitors to the Tampen Link project in the Norwegian sector in the North Sea (Sept 07). ClampOn will supply its ultrasonic non-intrusive acoustic Leak Monitors to Technip Norge AS on behalf of Statoil. The Leak Monitors will be retrofitted on two 20” gas valves on the seabed to verify/disprove through-valve gas leakage. These valves are currently open and they will be shut to close off the bypass alternative.
Helix Energy Solutions (NYSE: HLX) announced today that it has received a Letter of Intent ("LOI") for the installation of the subsea infrastructure for the VIC/P44 Stage 2 Development project in the Otway Basin offshore Australia. Participants in the VIC/P44 permit are Santos Limited (Operator) 50%, Peedamullah Petroleum Pty Ltd (Australian Worldwide Exploration) 25% and Mitsui E&P Australia Pty Ltd. 25%.
Velosi Limited Velosi or the Group, a provider of asset integrity and HSE services to a number of major national and multinational oil and gas companies, is pleased to announce that it has been re-awarded a contract from Mobil Producing Nigeria, for the next three years with an option to extend for a further one year.
Fugro has been awarded a contract to perform a detailed marine survey in the Mediterranean Sea to select the best route for the GALSI gas pipeline from Algeria to Southern Sardinia and then from Northern Sardinia to the mainland of Italy. The contract value is approximately EUR 18 million.