Technip awarded contract by Valiant for Causeway development

Technip was awarded by Valiant Causeway Limited a lump sum contract, worth approximately €33 million, for the Causeway field development. This field is located about 450 kilometers North-east of Aberdeen, Scotland at a water depth of 150 metres. Full text

Aker Solutions signs world first subsea gas compression contract

2010.12.01 - Subsea Headlines

"This award signifies a quantum leap for subsea gas compression within the oil and gas industry. As one of the major subsea contracts awarded during 2010, this has been a key target for Aker Solutions. It confirms our position as the preferred partner of subsea technology, solutions and capability," says Mads Andersen, executive vice president of Aker Solutions' subsea business area.  

When gas is produced the pressure in the reservoir decreases and the well flow may need boosting in the form of compression. In many instances, subsea compression technology is necessary to create enough pressure for the hydrocarbons to travel up the pipelines to the receiving terminal.  

The subsea compression system provides improved energy efficiency and safety, and lower investment and operating costs when compared to using a traditional platform and is a concept suitable for most large subsea gas fields.

Aker Solutions' scope of work for the subsea compression system includes a subsea compressor manifold station (SCMS), subsea compressor station (SCSt) template structure, three identical compressor trains, all electrical control systems, high voltage electrical power distribution system, topside equipment, and tooling, transport and installation equipment.

"We are extremely pleased to be chosen for this huge milestone contract with Statoil. The synergies we have developed with Statoil on the Ormen Lange gas compression pilot project have given us valuable experience which we can now transfer to this project. Over 25 years of development and long term commitment have led to this Åsgard award," says Andersen. 

Åsgard is located at Haltenbanken outside Norway in water depths varying from 240-310 metres. The Midgard and Mikkel reservoirs contain gas and condensate that are transported through long distance flowlines to the Åsgard B platform.

The project will be managed out of Aker Solutions' headquarter in Oslo; Norway, while the equipment will be primarily manufactured at Aker Solutions' facilities in Egersund, and Tranby, Norway, and in Aberdeen, UK. Final equipment deliveries will be made in stages with the SCMS and the SCSt template structure delivered in 2013 and the compressor trains, controls and power equipment delivered in 2014.

Contract party is Aker Solutions' subsidiary Aker Subsea AS.

Picture://Aker Solutions

Follow SubseaDirectory on Facebook !

Follow SubseaDirectory on Twitter !

More Subsea Company Listing, Subsea Events and Subsea Jobs and Subsea Article on SubseaDirectory




See also:

Applied Acoustics - Easytrak Sales Hit 50 and Growing

Applied Acoustics has recently announced the sale of its 50th Easytrak subsea tracking system at Offshore Europe, Aberdeen. The system is one of a pair that has been ordered by CaspianLab in Azerbaijan for use in their operations in the Caspian Sea.

Tampen Link Gas from Statfjord to the UK

The Tampen Link pipeline for gas export from the North Sea’s Statfjord field to the St Fergus gas terminal in Scotland opened on Friday evening. The field is consequently beginning a new era.

Recommends Troll development project to be discontinued 

StatoilHydro, as operator of the Troll field, has recommended to its partners to discontinue the Troll Future Development project.

Breakthrough subsea contract to Aker Kvaerner in the US

Petrobras Americas Inc. has awarded Aker Kvaerner a contract to supply subsea power cables and control umbilicals to its Cascade and Chinook fields in the Gulf of Mexico. The contract, worth approximately USD 65 million, represents a significant breakthrough for Aker Kvaerner's power cable technology.

StatoilHydro will sign Shtokman agreement with Gazprom

StatoilHydro will today, 25th of October, sign a frame agreement with Gazprom to become partner in the Shtokman development, phase 1.