Delmar successfully install its subsea rig mooring system in GoM

Delmar successfully install its subsea rig mooring system in GoM

Delmar Systems, Inc. successfully installed the first rig set of eight gravity-installed vertical load anchors (VLAs) in the Gulf of Mexico. the patented OMNI-Max anchors were installed at Eni's Green Canyon 385 (Pegasus) location in June 2008 in approximately 3600' water depth. Full text

Aminex find more Nyuni gas offshore Tanzania

2008.03.17 - Projects

Aminex PLC (“Aminex”) announces a successful result from the drilling of Kiliwani North -1 (“KN-1”), offshore Tanzania in the Nyuni/East Songo-Songo licence area.

KN-1 has intersected a substantial gas column in Lower Cretaceous sandstones, the same reservoir that produces gas commercially in the neighbouring Songo-Songo gas field. Electric logging has been completed and formation pressures taken which confirm the presence of gas over a gross interval of approximately sixty metres. This vertical well was drilled to a depth of 2030 metres (6,687 ft), ahead of schedule. 

KN-1 will now be completed as a gas production well pending hook-up for production and a test will be conducted to determine flow capacity and reservoir properties. Further appraisal drilling will be required to define the extent of this discovery.

Preliminary evaluation indicates a gas-water contact approximately 30 metres deeper than at the adjacent Songo-Songo Gas field. This is a positive outcome for the potential of other exploration prospects and leads in the Nyuni licence area. This deeper gas-water contact demonstrates that the KN-1 discovery is in a separate structure to the Songo-Songo field and this further enhances the prospectivity of the remaining leads and prospects within the Nyuni licence.

KN-1 also encountered minor oil shows in the Neocomian reservoir section, as well as confirming the presence of potential reservoirs in the Tertiary section at an earlier stage in the well.

The Nyuni/East Songo-Songo licence is only one component of Aminex’s acreage portfolio in East Africa, which includes the highly prospective Ruvuma Basin area of Tanzania as well as large acreage positions in Madagascar and Kenya, on all of which new seismic has now been acquired. In addition, Aminex is currently participating in the Malak-1 exploration well in the West esh el Mellahah concession in Egypt, which spudded on 25 February and is drilling ahead on schedule.




See also:

First oil on FPSO Sevan Piranema

The FPSO Sevan Piranema has today commenced oil production on the Piranema field, off the coast of Aracaju, in the state of Sergipe, Brasil.

First StatoilHydro-operated deepwater field in Gulf of Mexico

Q is located in Mississippi Canyon block 961. The natural gas field is developed as a subsea tieback to the Anadarko-operated Independence Hub facility in the eastern US Gulf of Mexico. StatoilHydro has a 50% working interest in the Q field.

Petrobras start production on deep water field

The Piranema field, 25 km off the coast of Sergipe, started producing oil this Wednesday (10/10), in deep Northeastern Brazil waters. With operations going online in this field, Petrobras is taking another step towards maintaining Brazil’s oil self-sufficiency. The Piranema oil, of excellent quality, at 44º API, is the lightest oil produced in deep waters in Brazil.

First LNG shipment from Snøhvit

The first tanker with a cargo of liquefied natural gas (LNG) from the Snøhvit field left port at Melkøya near Hammerfest, northern Norway

ExxonMobil Announces Startup of Marimba North Project Offshore Angola

Exxon Mobil Corporation (NYSE:XOM) announced today that its subsidiary, Esso Exploration Angola (Block 15) Limited, has started production from the Marimba North project, designed to develop 80 million barrels of oil in approximately 3,900 feet (1,300 meters) of water more than 90 miles (145 kilometers) off the coast of Angola.