Chevron Deploys a Second Ultra-Deepwater Drillship

Chevron Deploys a Second Ultra-Deepwater Drillship

Chevron U.S.A. Inc., a wholly owned subsidiary of Chevron Corporation (NYSE: CVX), today announced that it has commenced operations on the Discoverer Inspiration, an ultra-deepwater drillship, in the U.S. Gulf of Mexico. The vessel has the capability to drill wells in 12,000 feet (3,650 meters) of water to a total depth of 40,000 feet (12,200 meters). Full text

BJ Services completes major pipelineprecommissioning operation for Technip in India

2009.06.23 - Projects

BJ Services Company today announced that has completed a major contract to provide precommissioning services for Technip on the MA-D6 oilfield development offshore India. The oilfield is located in the Krishna Godavari Basin in the Bay of Bengal South East offshore Kakinada. 

BJ Services was awarded a contract by Technip in January 2008 to supply a range of precommissioning services. The scope of the project required the company to plan and manage several different phases, including initial engineering and project management services designed to complete the work within a tight timeframe. Hydraulic and electrical testing of both dynamic and infield umbilicals was carried out during pre-installation, installation, overboarding and post-installation phases of the operation. BJ’s pipeline precommissioning specialists carried out cleaning, flooding and pressure testing of the 8-in. production infield flowlines. In addition, the 6-in. gas injection riser was cleaned, flooded, pressure-tested and treated with mono ethylene glycol (MEG). The fast-track operation was carried out efficiently and completed on schedule.
 
Flowline Extends to Water Depths of 1,200 M
The MA-D6 is part of the larger KG-D6 oil and gas field that is situated in water depths of up to 1,200 m (3,937 ft.). The pipeline network gathers oil and gas from the Krishna Godavari Basin for export onshore to India. The system is extensive, involving a complicated network of gas and oil export pipelines and flowlines.
BJ Services personnel carried out related services on the MA-D6 project for Technip. All aspects of this intricate precommissioning programme were carried out by BJ without extensive use of subcontractors. “The MA-D6 project was challenging for a number of reasons, including the fast-track timeframe and the water depths in which we were working,” said Lindsay Link, general manager, BJ Services, Process and Pipeline Services. “A great deal of detailed engineering and planning was required to ensure that we would be able to complete all phases of the project on schedule. If you consider that the work was performed with zero downtime, it wasn’t easy. Given that the operation was carried out smoothly, it is an impressive achievement,” he added.
During recent years, BJ Services has carried out pipeline precommissioning operations in Tapti Field, and on various onshore and offshore pipeline developments in the region.
 




See also:

First oil on FPSO Sevan Piranema

The FPSO Sevan Piranema has today commenced oil production on the Piranema field, off the coast of Aracaju, in the state of Sergipe, Brasil.

First StatoilHydro-operated deepwater field in Gulf of Mexico

Q is located in Mississippi Canyon block 961. The natural gas field is developed as a subsea tieback to the Anadarko-operated Independence Hub facility in the eastern US Gulf of Mexico. StatoilHydro has a 50% working interest in the Q field.

Petrobras start production on deep water field

The Piranema field, 25 km off the coast of Sergipe, started producing oil this Wednesday (10/10), in deep Northeastern Brazil waters. With operations going online in this field, Petrobras is taking another step towards maintaining Brazil’s oil self-sufficiency. The Piranema oil, of excellent quality, at 44º API, is the lightest oil produced in deep waters in Brazil.

First LNG shipment from Snøhvit

The first tanker with a cargo of liquefied natural gas (LNG) from the Snøhvit field left port at Melkøya near Hammerfest, northern Norway

ExxonMobil Announces Startup of Marimba North Project Offshore Angola

Exxon Mobil Corporation (NYSE:XOM) announced today that its subsidiary, Esso Exploration Angola (Block 15) Limited, has started production from the Marimba North project, designed to develop 80 million barrels of oil in approximately 3,900 feet (1,300 meters) of water more than 90 miles (145 kilometers) off the coast of Angola.