Delmar successfully install its subsea rig mooring system in GoM

Delmar successfully install its subsea rig mooring system in GoM

Delmar Systems, Inc. successfully installed the first rig set of eight gravity-installed vertical load anchors (VLAs) in the Gulf of Mexico. the patented OMNI-Max anchors were installed at Eni's Green Canyon 385 (Pegasus) location in June 2008 in approximately 3600' water depth. Full text

Deep Down deliver flying leads and UTH to Phoenix project

2008.04.07 - Projects

Deep Down, Inc. announced today that it has shipped $1.5 million worth of products for the Phoenix project, including six next generation Loose-tube Steel Flying Leads (LSFLs). Additional revenue will be generated through installation support at a later date.

Several of these LSFLs contain fifteen (one-half inch) Super Duplex steel tubes. The LSFLs were delivered to the customer and incorporated into a successful Systems Integration Test program. The LSFLs possess newly engineered and improved features that are so significant in the evolution of steel flying leads that Deep Down is applying for patents. The newly improved design of the LSFLs makes these much easier to install. Quicker, easier, ROV-based installations translate into significant cost savings for Deep Down's customers.

Deep Down also delivered four Electrical Hydraulic Compliant Moray(TM) Umbilical Termination Heads, which were terminated to the end of steel tube umbilicals. The use of Electrical Hydraulic Compliant Moray Umbilical Termination Heads allows full sized umbilicals to be plugged directly into subsea trees by a remote operated vehicle, thus eliminating the need for large Umbilical Termination Assemblies (UTA). The unique Umbilical Termination Head design translates into additional cost savings and is ideal for single well tie-backs or long extension umbilicals.

Deep Down will deliver the LSFLs on its proprietary Subsea Deployment Baskets (SDB). The installation contractor is considering installing the LSFLs with Deep Down's recently introduced subsea deployment method because of its effectiveness in reducing installation time. The use of SDBs also reduces the risk for safety incidents by reducing the amount of personnel time needed to deploy LSFLs over a lay chute versus the seconds it takes to overboard a SDB into the water.




See also:

First oil on FPSO Sevan Piranema

The FPSO Sevan Piranema has today commenced oil production on the Piranema field, off the coast of Aracaju, in the state of Sergipe, Brasil.

First StatoilHydro-operated deepwater field in Gulf of Mexico

Q is located in Mississippi Canyon block 961. The natural gas field is developed as a subsea tieback to the Anadarko-operated Independence Hub facility in the eastern US Gulf of Mexico. StatoilHydro has a 50% working interest in the Q field.

Petrobras start production on deep water field

The Piranema field, 25 km off the coast of Sergipe, started producing oil this Wednesday (10/10), in deep Northeastern Brazil waters. With operations going online in this field, Petrobras is taking another step towards maintaining Brazil’s oil self-sufficiency. The Piranema oil, of excellent quality, at 44º API, is the lightest oil produced in deep waters in Brazil.

First LNG shipment from Snøhvit

The first tanker with a cargo of liquefied natural gas (LNG) from the Snøhvit field left port at Melkøya near Hammerfest, northern Norway

ExxonMobil Announces Startup of Marimba North Project Offshore Angola

Exxon Mobil Corporation (NYSE:XOM) announced today that its subsidiary, Esso Exploration Angola (Block 15) Limited, has started production from the Marimba North project, designed to develop 80 million barrels of oil in approximately 3,900 feet (1,300 meters) of water more than 90 miles (145 kilometers) off the coast of Angola.