StatoilHydro add production to Oseberg area from satellites

StatoilHydro add production to Oseberg area from satellites

StatoilHydro today said that the development of the Oseberg area in the North Sea continues. Oseberg Delta and Theta Cook, which have now come on stream, add considerable production value. When well number two on Oseberg Delta comes on line in the autumn, another 7,000 barrels per day will be added. Full text

ENI moves on with Longhorn subsea project

2008.04.28 - Projects

Eni has started the development of the Longhorn gas field, located in the Gulf of Mexico (blocks MC 502 and 546) approximately 195 kilometres southeast of New Orleans in 730 meters (2,400 feet) of water depth. The Longhorn development is operated by Eni with a 75% working interest, while Nexen Petroleum Offshore U.S.A. Inc. owns 25%.

After the successful completion of the offshore appraisal campaign in October 2007, the Longhorn project has been sanctioned with total investments of $587 million. Initial production is expected to begin in March 2009 with a gross peak production rate of 200 million cubic feet per day (approx. 35,000 barrels of oil equivalent per day). In addition, the appraisal campaign showed interesting upside potential in the field, with the presence of additional hydrocarbon pay whose commerciality is currently being evaluated.

Major contracts for subsea equipment supply have been awarded and manufacturing is underway. Offshore installation contracts are in the process of being awarded. Well completion operations will start in Q3 2008 with the Transocean Amirante rig, currently under a 3 year contract with Eni, which makes the rig available for this activity as well as other Eni operated operations in Gulf of Mexico. The Longhorn development will consist of three subsea wells tied back approximately 32 kilometres to the Crystal platform.

Eni holds additional interests in other leases in the Greater Longhorn Area, which is one of its core areas in the Gulf of Mexico. Additional exploration activity is currently being carried out. The Longhorn development continues to strengthen Eni's operating presence and production in the Gulf of Mexico.    

In the US, Eni currently owns lease interests in 408 Gulf of Mexico blocks, 70% of which are in deepwater. Eni is also one of the largest Gulf of Mexico producers with a daily equity production in excess of 110,000 boe, of which 60% is operated. In addition, Eni also owns interests in 158 leases on the North Slope of Alaska.




See also:

First oil on FPSO Sevan Piranema

The FPSO Sevan Piranema has today commenced oil production on the Piranema field, off the coast of Aracaju, in the state of Sergipe, Brasil.

First StatoilHydro-operated deepwater field in Gulf of Mexico

Q is located in Mississippi Canyon block 961. The natural gas field is developed as a subsea tieback to the Anadarko-operated Independence Hub facility in the eastern US Gulf of Mexico. StatoilHydro has a 50% working interest in the Q field.

Petrobras start production on deep water field

The Piranema field, 25 km off the coast of Sergipe, started producing oil this Wednesday (10/10), in deep Northeastern Brazil waters. With operations going online in this field, Petrobras is taking another step towards maintaining Brazil’s oil self-sufficiency. The Piranema oil, of excellent quality, at 44º API, is the lightest oil produced in deep waters in Brazil.

First LNG shipment from Snøhvit

The first tanker with a cargo of liquefied natural gas (LNG) from the Snøhvit field left port at Melkøya near Hammerfest, northern Norway

ExxonMobil Announces Startup of Marimba North Project Offshore Angola

Exxon Mobil Corporation (NYSE:XOM) announced today that its subsidiary, Esso Exploration Angola (Block 15) Limited, has started production from the Marimba North project, designed to develop 80 million barrels of oil in approximately 3,900 feet (1,300 meters) of water more than 90 miles (145 kilometers) off the coast of Angola.