Rotork actuates sub-sea safety valve installations at Egyptian gas field

Rotork Fluid Systems has supplied the specialised hydraulic actuator package for a second sub-sea safety isolation valve (SSIV) installation on the same offshore gas gathering project off the coast of Egypt. Full text

Fairmount tugs deliver Skarv Idun

2011.03.06 - Projects

Fairmount Marine’s powerful tugs Fairmount Sherpa and Fairmount Summit have delivered FPSO Skarv Idun in the port of Stord, Norway. The two tugs needed just 92 days for the long distance tow of about 15.300 nautical miles from Samsung Heavy Industries’ shipyard in Okpo, South Korea. The towage was executed under command of Fairmount’s lead tow master captain Bertus Glas and was completed with an average speed of 7.0 knots including stops.

The Skarv Idun is a large floating production storage and offloading unit and will be used by BP to exploit the oil and gas fields Skarv and Idun, located just below the Arctic circle in the northern Norwegian Sea. The FPSO is 292 meters long, 50.6 meters wide, has a towing draught of 12. meters and has a deadweight of 128.000 ton. A crew between 65 and 100 was on board Skarv Idun during the passage for on the job training, running the vessel, surveillance and providing marine support to the tug crews.

Fairmount Sherpa and Fairmount Summit have a combined bollard pull of over 200 tons. The long distance tow was done via Singapore and Cape of Good Hope. Last weekend the tow passed the English Channel. “The towage is completed is just 92 days, including stops for bunkers, other supplies and crew changes – exactly in line with the original planning,’’ says Albert J. de Heer, ceo of Fairmount Marine. “Considering the enormous distance this is a great achievement.’’

Follow SubseaDirectory on Facebook !

Follow SubseaDirectory on Twitter !

More Subsea Company Listing, Subsea Events and Subsea Jobs and Subsea Article on SubseaDirectory




See also:

First oil on FPSO Sevan Piranema

The FPSO Sevan Piranema has today commenced oil production on the Piranema field, off the coast of Aracaju, in the state of Sergipe, Brasil.

First StatoilHydro-operated deepwater field in Gulf of Mexico

Q is located in Mississippi Canyon block 961. The natural gas field is developed as a subsea tieback to the Anadarko-operated Independence Hub facility in the eastern US Gulf of Mexico. StatoilHydro has a 50% working interest in the Q field.

Petrobras start production on deep water field

The Piranema field, 25 km off the coast of Sergipe, started producing oil this Wednesday (10/10), in deep Northeastern Brazil waters. With operations going online in this field, Petrobras is taking another step towards maintaining Brazil’s oil self-sufficiency. The Piranema oil, of excellent quality, at 44º API, is the lightest oil produced in deep waters in Brazil.

First LNG shipment from Snøhvit

The first tanker with a cargo of liquefied natural gas (LNG) from the Snøhvit field left port at Melkøya near Hammerfest, northern Norway

ExxonMobil Announces Startup of Marimba North Project Offshore Angola

Exxon Mobil Corporation (NYSE:XOM) announced today that its subsidiary, Esso Exploration Angola (Block 15) Limited, has started production from the Marimba North project, designed to develop 80 million barrels of oil in approximately 3,900 feet (1,300 meters) of water more than 90 miles (145 kilometers) off the coast of Angola.