Trelleborg supports worlds first full scale floating wind turbine

Trelleborg supports worlds first full scale floating wind turbine

Statoil’s innovative new offshore floating Hywind wind turbine, now successfully moored in the North Sea off the Norwegian coast, is demonstrating how Trelleborg Offshore’s syntactic foam buoyancy technology is contributing to the future of offshore power generation. Full text

First Oil and Gas Production from West Bukha Field offshore Oman

2009.02.18 - Projects

Heritage Oil Limited (LSE: HOIL), an independent upstream exploration and production company, announces the commencement of oil and associated gas production from the West Bukha field in Block 8, located in the Strait of Hormuz offshore of the Sultanate of Oman (“Oman”). Heritage has a 10% working interest.

The West Bukha field in Oman has commenced production with initial flow rates of approximately 10,000 barrels per day of good quality, light sweet, 42 degree API oil and 30 MMcf per day of associated gas from the Mishriff-Maudud and Thamama reservoirs. Production is from two wells through a recently installed six-slot unmanned platform located in 90 metres of water approximately 25 kilometres from the Musandam Peninsula. The field is considered to have additional untapped potential which will require further appraisal.


Production is tied through a subsea 12-inch multiphase flow line to the nearby Bukha production platform. The Bukha gas condensate field, also in Block 8, commenced production in 1994 and today can flow an additional 10 to 15 MMcf per day of non-associated gas with condensate. Output from the two fields is transported to shore by a 33-kilometre multiphase pipeline for processing at the Khor Khwair plant in the Emirate of Ras Al Khaimah. Oil and condensate are slated for export and gas is delivered to industrial and commercial users in the Emirate.


Eagle Energy (Oman) Limited, a wholly-owned subsidiary of Heritage, acquired its 10% working interest in Block 8 offshore Oman in 1996. The licence area covers 423 square kilometres containing the Bukha gas condensate field and the West Bukha oil field. The West Bukha field straddles the maritime boundary between Oman and the Islamic Republic of Iran.




See also:

First oil on FPSO Sevan Piranema

The FPSO Sevan Piranema has today commenced oil production on the Piranema field, off the coast of Aracaju, in the state of Sergipe, Brasil.

First StatoilHydro-operated deepwater field in Gulf of Mexico

Q is located in Mississippi Canyon block 961. The natural gas field is developed as a subsea tieback to the Anadarko-operated Independence Hub facility in the eastern US Gulf of Mexico. StatoilHydro has a 50% working interest in the Q field.

Petrobras start production on deep water field

The Piranema field, 25 km off the coast of Sergipe, started producing oil this Wednesday (10/10), in deep Northeastern Brazil waters. With operations going online in this field, Petrobras is taking another step towards maintaining Brazil’s oil self-sufficiency. The Piranema oil, of excellent quality, at 44º API, is the lightest oil produced in deep waters in Brazil.

First LNG shipment from Snøhvit

The first tanker with a cargo of liquefied natural gas (LNG) from the Snøhvit field left port at Melkøya near Hammerfest, northern Norway

ExxonMobil Announces Startup of Marimba North Project Offshore Angola

Exxon Mobil Corporation (NYSE:XOM) announced today that its subsidiary, Esso Exploration Angola (Block 15) Limited, has started production from the Marimba North project, designed to develop 80 million barrels of oil in approximately 3,900 feet (1,300 meters) of water more than 90 miles (145 kilometers) off the coast of Angola.