Success for Wilton as SAIPEM J Lay Tower sets sail

Success for Wilton as SAIPEM J Lay Tower sets sail

Awarded to Wilton Engineering Services (part of the Wilton Group) by IHC EB, the contract encompassed the fabrication and construction of a giant 1500 tonne top tension J Lay Tower plus ancillary equipment for Saipem’s new Pipelay vessel - FDS2.
Full text

First Subsea Supplies STP Buoy Mooring and Pull-in Connectors for Peregrino FPSO

2009.08.24 - Projects

Advanced Production and Loading (APL), a BW Offshore division, has awarded subsea mooring connector specialist, First Subsea Ltd, a contract to supply mooring line connectors and buoy pull-in connector for the Peregrino FPSO submerged turret production (STP) buoy.

The Peregrino STP buoy will be moored in 100m of water, 85km offshore Brazil.  The FPSO is operated by Maersk FPSOs Brazil.

First Subsea is providing ten Ballgrab ball and taper connectors with a minimum breaking load (MBL) of 10,600kN for its 30 year life. The female Ballgrab connectors are attached around the side of the buoy ahead of tow out. Once in position the male Ballgrabs and mooring lines are connected subsea with assistance by ROV, avoiding the need for divers.

Peregrino Buoy Pull-in Tool

APL is also using a Ballgrab buoy pull-in tool to pull the 600 tonne STP buoy into the FPSO. The female part of the connector is integrated within the top of the STP buoy.  Once the FPSO is in position, the Ballgrab male connector is lowered into the female connector on the STP buoy, locked into position and the buoy pulled into the FPSO's mating cone.

APL project manager, Arild Saudland, commented, “We selected the Ballgrab mooring connectors and buoy pull-in tool mainly based on a competitive schedule and proven design.”

First Subsea's latest STP Buoy Mooring

Peregrino is First Subsea's fourth STP buoy mooring project. “We are delighted to have been awarded the Peregrino buoy mooring contract. Buoy mooring is becoming something of a First Subsea speciality, and demonstrates the flexibility of the mooring options offered by the Ballgrab connector,” said Brian Green, general manager, First Subsea.




See also:

First oil on FPSO Sevan Piranema

The FPSO Sevan Piranema has today commenced oil production on the Piranema field, off the coast of Aracaju, in the state of Sergipe, Brasil.

First StatoilHydro-operated deepwater field in Gulf of Mexico

Q is located in Mississippi Canyon block 961. The natural gas field is developed as a subsea tieback to the Anadarko-operated Independence Hub facility in the eastern US Gulf of Mexico. StatoilHydro has a 50% working interest in the Q field.

Petrobras start production on deep water field

The Piranema field, 25 km off the coast of Sergipe, started producing oil this Wednesday (10/10), in deep Northeastern Brazil waters. With operations going online in this field, Petrobras is taking another step towards maintaining Brazil’s oil self-sufficiency. The Piranema oil, of excellent quality, at 44º API, is the lightest oil produced in deep waters in Brazil.

First LNG shipment from Snøhvit

The first tanker with a cargo of liquefied natural gas (LNG) from the Snøhvit field left port at Melkøya near Hammerfest, northern Norway

ExxonMobil Announces Startup of Marimba North Project Offshore Angola

Exxon Mobil Corporation (NYSE:XOM) announced today that its subsidiary, Esso Exploration Angola (Block 15) Limited, has started production from the Marimba North project, designed to develop 80 million barrels of oil in approximately 3,900 feet (1,300 meters) of water more than 90 miles (145 kilometers) off the coast of Angola.