Rotork actuates sub-sea safety valve installations at Egyptian gas field

Rotork Fluid Systems has supplied the specialised hydraulic actuator package for a second sub-sea safety isolation valve (SSIV) installation on the same offshore gas gathering project off the coast of Egypt. Full text

Jubilee's Development on Track Tullow Says

2009.07.08 - Projects

Tullow Oil today annonced tha the Jubilee Phase 1 Plan of Development is finalised with the Government of Ghana for formal approval. Development drilling, FPSO conversion and subsea facilities fabrication all on track for 2010 first oil.

Follow SubseaDirectory on Facebook !

Follow SubseaDirectory on Twitter !

More Subsea Company Listing, Subsea Events and Subsea Jobs and Subsea Article on SubseaDirectory




See also:

First oil on FPSO Sevan Piranema

The FPSO Sevan Piranema has today commenced oil production on the Piranema field, off the coast of Aracaju, in the state of Sergipe, Brasil.

First StatoilHydro-operated deepwater field in Gulf of Mexico

Q is located in Mississippi Canyon block 961. The natural gas field is developed as a subsea tieback to the Anadarko-operated Independence Hub facility in the eastern US Gulf of Mexico. StatoilHydro has a 50% working interest in the Q field.

Petrobras start production on deep water field

The Piranema field, 25 km off the coast of Sergipe, started producing oil this Wednesday (10/10), in deep Northeastern Brazil waters. With operations going online in this field, Petrobras is taking another step towards maintaining Brazil’s oil self-sufficiency. The Piranema oil, of excellent quality, at 44º API, is the lightest oil produced in deep waters in Brazil.

First LNG shipment from Snøhvit

The first tanker with a cargo of liquefied natural gas (LNG) from the Snøhvit field left port at Melkøya near Hammerfest, northern Norway

ExxonMobil Announces Startup of Marimba North Project Offshore Angola

Exxon Mobil Corporation (NYSE:XOM) announced today that its subsidiary, Esso Exploration Angola (Block 15) Limited, has started production from the Marimba North project, designed to develop 80 million barrels of oil in approximately 3,900 feet (1,300 meters) of water more than 90 miles (145 kilometers) off the coast of Angola.