Projects
2008.02.27 -
Projects -
BP started production at five BP-operated major projects: Mango and Cashima in Trinidad, Atlantis and King Subsea Pump in the Gulf of Mexico and Greater Plutonio in Angola. Additionally, BP had first production from the Denise field in Egypt, Full text
2008.02.14 -
Projects -
The world's first complete subsea solution for separating and injecting water and sand from the wellstream is on stream and creating added value at the Tordis field. Full text
2008.02.12 -
Projects -
The Kupe Gas Project has reached a key milestone, with the final stage of the main offshore gas pipeline being laid by one of the world’s most advanced pipelaying vessels, the Apache. Full text
2008.01.19 -
Projects -
The successful exploration and delineation program around the White Rose field has led to the identification of a number of potential satellite tieback developments. The first of these to be developed will be North Amethyst. Full text
2008.01.15 -
Projects -
BHP Billiton today announced that its operated Stybarrow project offshore northwest has achieved sustained production levels at planned capacity. It was brought on stream in November approximately two months ahead of schedule. Full text
2008.01.10 -
Projects -
Exxon Mobil Corporation announced today that its subsidiary, Esso Exploration Angola (Block 15) Limited (Esso Angola), has started production from the Kizomba C development, designed to develop 600 million barrels of oil from the Mondo, Saxi and Batuque fields in approximately 2,400 feet (800 meters) of water more than 90 miles (145 kilometers) off the coast of Angola. Full text
2008.01.09 -
Projects -
StatoilHydro intends to achieve long term growth from a strong resource base with significant exploration activities worldwide. This year’s exploration programme represents an all time high for the new company, amounting to around NOK 18 billion, based on around 70 wells, split approximately 50/50 between NCS and internationally.
Full text
2007.12.20 -
Projects -
StatoilHydro has awarded Aker Kvaerner a contract for tow and installation of the Gjøa Semi in the North Sea. The total contract value is approximately NOK 180 million. Full text
2007.12.19 -
Projects -
Talisman North Sea Limited, a wholly owned subsidiary of Talisman Energy Inc. (TSX:TLM) (NYSE:TLM), has commenced production from the Wood Field. The field is expected to produce at a peak rate of 6,000 bbls/d of oil and 16 mmcf/d of natural gas. The new facilities will allow the export of an additional 9 mmcf/d from the Montrose, Arbroath, Arkwright and Brechin ("MonArb") fields. Full text
2007.12.18 -
Projects -
BP today announced that natural gas production from the Cashima field, offshore Trinidad, started on December 15, 2007. This followed the first gas production from the nearby Mango field on November 17. Full text