Rotork actuates sub-sea safety valve installations at Egyptian gas field

Rotork Fluid Systems has supplied the specialised hydraulic actuator package for a second sub-sea safety isolation valve (SSIV) installation on the same offshore gas gathering project off the coast of Egypt. Full text

Statoil announces official opening of Tyrihans

2011.03.25 - Projects

The Tyrihans subsea field in the Norwegian Sea is making a considerable contribution  to Statoil’s production on the Norwegian continental shelf (NCS). The field will be officially opened at a ceremony in Trondheim on Thursday 24 March.

The field consists of Tyrihans South, a gas-capped oil field, and Tyrihans North, a gas and condensate field with thin oil zone.

Tyrihans consists of five seabed templates. Four of the templates are used for production and gas injection, while the fifth is used for sea water injection.

Technology developed in connection with Tyrihans sets a new standard for the development of seabed fields.

Tyrihans is tied back to the installations and infrastructure on the Kristin and Åsgard fields on Haltenbanken.

The well stream is transported through a 43.6 km long pipeline to Kristin for processing. The gas is exported from Kristin via the Åsgard transport pipeline to the Kårstø facility in  Rogaland.

Oil and condensate are piped to the storage vessel Åsgard C for onward transport by tanker.

The volumes in the field are of similar magnitude to those on Kristin and both fields share a joint operational organisation.

“Tyrihans will for many years to come make a considerable contribution to our production on the NCS, and will be strategically significant for the development of our activities in the  Norwegian Sea,” says Øystein Michelsen, executive vice president, Development and Production Norway.

Early involvement and close cooperation between the various disciplines within petroleum technology, drilling and well, made possible the development of well equipment specially designed for this field.

New well technology has ensured that the recovery rate on Tyrihans is higher than initially expected when production started up in the summer of 2009.

Multilateral and smart wells with downhole regulatory equipment have improved the overall control of reservoir production.

Pumps for sea water injection placed directly on the seabed also help boost recovery.     

In the 20 months since coming on stream, the Tyrihans field has exceeded all production expectations. The field currently produces around 100,000 barrels per day and, together with the Kristin field, it fills the total capacity for the export of oil and condensate from the Kristin platform.

Follow SubseaDirectory on Facebook !

Follow SubseaDirectory on Twitter !

More Subsea Company Listing, Subsea Events and Subsea Jobs and Subsea Article on SubseaDirectory




See also:

First oil on FPSO Sevan Piranema

The FPSO Sevan Piranema has today commenced oil production on the Piranema field, off the coast of Aracaju, in the state of Sergipe, Brasil.

First StatoilHydro-operated deepwater field in Gulf of Mexico

Q is located in Mississippi Canyon block 961. The natural gas field is developed as a subsea tieback to the Anadarko-operated Independence Hub facility in the eastern US Gulf of Mexico. StatoilHydro has a 50% working interest in the Q field.

Petrobras start production on deep water field

The Piranema field, 25 km off the coast of Sergipe, started producing oil this Wednesday (10/10), in deep Northeastern Brazil waters. With operations going online in this field, Petrobras is taking another step towards maintaining Brazil’s oil self-sufficiency. The Piranema oil, of excellent quality, at 44º API, is the lightest oil produced in deep waters in Brazil.

First LNG shipment from Snøhvit

The first tanker with a cargo of liquefied natural gas (LNG) from the Snøhvit field left port at Melkøya near Hammerfest, northern Norway

ExxonMobil Announces Startup of Marimba North Project Offshore Angola

Exxon Mobil Corporation (NYSE:XOM) announced today that its subsidiary, Esso Exploration Angola (Block 15) Limited, has started production from the Marimba North project, designed to develop 80 million barrels of oil in approximately 3,900 feet (1,300 meters) of water more than 90 miles (145 kilometers) off the coast of Angola.