Rotork actuates sub-sea safety valve installations at Egyptian gas field

Rotork Fluid Systems has supplied the specialised hydraulic actuator package for a second sub-sea safety isolation valve (SSIV) installation on the same offshore gas gathering project off the coast of Egypt. Full text

Subsea 7 Marks Its Sixtieth Bundle Milestone on North Sea Project

2008.12.26 - Projects

Subsea 7 Inc (OSE Symbol: SUB), one of the world's leading subsea engineering and construction companies, has announced that it has successfully launched and installed its sixtieth pipeline bundle - a 1.3km pipeline bundle for BP's Machar field.

Subsea 7 was awarded the $22 million fast-track contract earlier this year. The pipeline bundle incorporates a 12" sleeve system containing a dry-insulated 8" lined production pipeline, 6" plastic lined water injection flowline, 3" gas lift line, electrical power and signal cables and hydraulic and chemical controls tubing. The bundle was launched from Wick in the North of Scotland on December 8th 2008 and offshore operations were completed on 16th December 2008.

Robin Davies, Subsea 7's North Sea Vice-President commented, "Subsea 7 has been using bundle technology now for over 30 years and it is still very important in both North Sea and international subsea developments, neatly incorporating all structures, valve work, pipelines and control systems necessary to operate a field. The safe and timely completion of the BP Machar bundle launch and installation demonstrates the capabilities of Subsea 7 in undertaking fast-track projects such as this and we are delighted to have assisted BP in bringing the Machar field on-stream."

The project has been managed and engineered from Subsea 7's offices in Aberdeen. Subsea 7 provided project management, detailed design, fabrication, onshore testing, subsea tow and installation of the 1.3km pipeline bundle.  Bundle fabrication was undertaken at Subsea 7's Wester bundle fabrication base in the north of Scotland.

Follow SubseaDirectory on Facebook !

Follow SubseaDirectory on Twitter !

More Subsea Company Listing, Subsea Events and Subsea Jobs and Subsea Article on SubseaDirectory




See also:

First oil on FPSO Sevan Piranema

The FPSO Sevan Piranema has today commenced oil production on the Piranema field, off the coast of Aracaju, in the state of Sergipe, Brasil.

First StatoilHydro-operated deepwater field in Gulf of Mexico

Q is located in Mississippi Canyon block 961. The natural gas field is developed as a subsea tieback to the Anadarko-operated Independence Hub facility in the eastern US Gulf of Mexico. StatoilHydro has a 50% working interest in the Q field.

Petrobras start production on deep water field

The Piranema field, 25 km off the coast of Sergipe, started producing oil this Wednesday (10/10), in deep Northeastern Brazil waters. With operations going online in this field, Petrobras is taking another step towards maintaining Brazil’s oil self-sufficiency. The Piranema oil, of excellent quality, at 44º API, is the lightest oil produced in deep waters in Brazil.

First LNG shipment from Snøhvit

The first tanker with a cargo of liquefied natural gas (LNG) from the Snøhvit field left port at Melkøya near Hammerfest, northern Norway

ExxonMobil Announces Startup of Marimba North Project Offshore Angola

Exxon Mobil Corporation (NYSE:XOM) announced today that its subsidiary, Esso Exploration Angola (Block 15) Limited, has started production from the Marimba North project, designed to develop 80 million barrels of oil in approximately 3,900 feet (1,300 meters) of water more than 90 miles (145 kilometers) off the coast of Angola.