Petrobras kicks off Campos Basin Platform P-53

Petrobras kicks off Campos Basin Platform P-53

Platform P-53, the first production unit installed in the Marlim Leste field, in the Campos Basin, kicked-off its operations yesterday (11/30). More than just a new oil and gas production unit, this platform represents a major victory for the Brazilian naval industry. Full text

VetcoGray Completes Challenging Project In Egypt's Gulf Of Suez

2008.07.30 - Projects

VetcoGray, a GE Oil & Gas business, applied its latest technology to overcome unique challenges, reduce project costs and risks, and successfully convert an exploration well to full production service at Agiba Petroleum Company's West Ashrafi hydrocarbon facility in Egypt's Gulf of Suez, Red Sea.

The project marks the first time that VetcoGray has converted a mudline exploration system to an SG-1 wellhead subsea system for production duty. The newly converted well entered service in April of this year.

"The new conversion system removed the need for Agiba Petroleum to re-enter the reservoir from a new wellhead, as this had proven difficult during the exploration phase. This solution therefore removed significant cost and risk from the project," said Willie Bryson, VetcoGray's Product Line Manager for Tree on Mudline.

"When the West Ashrafi well conversion was first envisioned, a number of technical challenges were identified that could have affected the viability of the project," he added. "VetcoGray worked closely with our customer to complete a feasibility study, which concluded that all of the challenges could be overcome. VetcoGray subsequently executed the engineering and construction of the conversion system, and supported the final installation through our Global Services division."

Additional challenges for the project included the distance between the beach-mounted topside equipment (umbilical termination and hydraulic power units,) and the master control station, which was located a kilometer away. A separate communications and power system was used to achieve the subsea communications, while fiber optic communications were utilized between the HPU/TUTU and the MCS.

"Our primary concern was making sure the project went according to plan and that we were able to get the new system on stream smoothly," said Marco Solca and Mohamed Mokhtar, Agiba - Project General Managers. Enrico Salardi, ENI-Project Manager, Offshore Egyptian Developments, added: "Thanks to the strong teamwork among the project participants, this was accomplished."

Based in Cairo, Egypt, Agiba Petroleum Company, a joint venture company between the Egyptian General Petroleum Corporation (EGPC) and ENI, produces approximately 50,000 barrels of oil per day. ENI, an Italian multi-national oil and gas company, has operated in Egypt for nearly 50 years.




See also:

First oil on FPSO Sevan Piranema

The FPSO Sevan Piranema has today commenced oil production on the Piranema field, off the coast of Aracaju, in the state of Sergipe, Brasil.

First StatoilHydro-operated deepwater field in Gulf of Mexico

Q is located in Mississippi Canyon block 961. The natural gas field is developed as a subsea tieback to the Anadarko-operated Independence Hub facility in the eastern US Gulf of Mexico. StatoilHydro has a 50% working interest in the Q field.

Petrobras start production on deep water field

The Piranema field, 25 km off the coast of Sergipe, started producing oil this Wednesday (10/10), in deep Northeastern Brazil waters. With operations going online in this field, Petrobras is taking another step towards maintaining Brazil’s oil self-sufficiency. The Piranema oil, of excellent quality, at 44º API, is the lightest oil produced in deep waters in Brazil.

First LNG shipment from Snøhvit

The first tanker with a cargo of liquefied natural gas (LNG) from the Snøhvit field left port at Melkøya near Hammerfest, northern Norway

ExxonMobil Announces Startup of Marimba North Project Offshore Angola

Exxon Mobil Corporation (NYSE:XOM) announced today that its subsidiary, Esso Exploration Angola (Block 15) Limited, has started production from the Marimba North project, designed to develop 80 million barrels of oil in approximately 3,900 feet (1,300 meters) of water more than 90 miles (145 kilometers) off the coast of Angola.